2020

Consorcio Acueducto Redes San Nicolás – Andina de Construcciones, Redyco

Sector: Public Utilities

Practice Area: Projects and Infrastructure |

Permanent legal advice for the execution of the contract for the construction of aqueduct networks and complementary works in Valle de San Nicolás, in the department of Antioquia.

COP 21.784.138.253

2020

Concesión Ruta al Mar – Construcciones El Cóndor, Infrared Capital Partners (The United Kingdom)

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Preparation of a legal concept on the scope of the operation and maintenance obligations of the Concessionaire within the framework of the execution of the 4G concession for the Antioquia-Bolivar connection.

Not applicable

2020

Consorcio HHA – Hyundai Engineering and construction (Korea), Acciona Agua (Spain)

Sector: Public Utilities

Practice Area: Projects and Infrastructure |

Representation of the client against the imposition of fines under the contract for the construction of the wastewater treatment plant “Aguas Claras” located in Bello in the department of Antioquia – ANEPM.

COP 44.000.000.000

2019

Pavimentar

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Preparation of the claim addressed to Fonvalmed, within the framework of the execution of the public work of the Loma Los Parra overpass in Medellín.

COP 650.000.000

2019

Odinec

Sector: Energy and Natural Resources

Practice Area: Projects and Infrastructure |

Legal advice and representation of the client in the execution of the energy infrastructure project for the construction, assembly, testing, and commissioning of 500 kV transmission lines between the depart

COP 128.432.834.317

2019

Consorcio Corredor Vial 013- ICPB- Ingeniería y Construcción Palacio Baena y Sococil- Sociedad Constructora de Obras Civiles

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Representation of the client and legal advice during the public bidding process for the contracting of the improvement, expansion, and paving of the Barbosa-La Raya road, an integral part of the road that connects the north of the Aburrá Valley and the San Nicolás Valley in the department of Antioquia.

COP 14.334.422.884

2019

ICPB- Ingeniería y Construcción Palacio Baena

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Permanent legal advice to the client during the execution of works contract No. 01 of 2017 for the construction of indigenous rural housing on its own site in the Karmata Rúa Cristianía reservation in the municipality of Jardín – VIVA.

COP 1.727.298.386

2018

Ossa – Obras Subterráneas (Spain)

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Permanent legal advice during the execution of the excavation and pre-support works for the double tunnel located in Sinifaná of the project Autopista Conexión Pacífico 1 – Conpacífico.

COP 68.416.318.483

2018

Construcciones y Dragados del Sureste (Mexico)

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Legal advice to the client during the execution of works contract No. 56 of 2017 entered into with Metroplús and financed by the IBRD for the Construction of the Metroplús project in the South of the Aburrá Valley Phase I and complementary works, which is part of a major public transportation service improvement plan, and presentation of claims to the contractor.  

COP 39.000.000.000

2018

Consorcio Cuencas Norte 2017- Redyco, Ingeniería y Contratos

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Permanent legal advice during the construction, replacement, expansion, and modernization of aqueduct and sewerage networks as well as connections and complementary works, group D – EPM in Bello.

COP 60.710.476.298