Mostrando 10 de 120
Enecón
Year: 2021
Sector: Energy and Natural Resources
Practice Area: Labor Law and Social SecurityProjects
Our team assumed the legal advice and representation of a renowned company of the energy sector as the defendant in the process of employer's liability initiated by a former employee of the company, reaching a settlement agreement for one-sixth of the claims of the lawsuit.
COP $600.000.000
Obras Subterráneas (Spain)
Our team advised a foreign company with a branch office in Colombia and led the negotiation with a worker who was entitled to reinforced labour stability protection as the employee was incapacitated during the employment relationship. With our effective intervention, a settlement agreement was signed for one-third of the value of the claims.
COP $100.000.000
O-tek Grupo Orbis
Legal advice to the client in the claim of an extra-contractual civil liability insurance policy, in connection with the execution of a contract in the United States.
USD $1.200.000
Consorcio Gaico Hycsa – Gaico Ingenieros Constructores (Mexico), Calzada Construcciones (Mexico)
Representation of the client in the Arbitration Tribunal convened in connection with the execution of the contract for the construction of the Metroplus project and complementary works in the municipality of Envigado.
COP 10.320.601.230
Vías de las Américas
Legal advice to the client in connection with the liquidation of the 3G concession contract for Transversal de Las Américas, Sector 1.
COP 1.200.000.000.000
Idom Consulting, Architecture and Engineering (Spain)
Representation of the client in legal disputes arising from the construction of the Ayacucho tramway in the city of Medellín.
COP 2.100.000.000
Asfalto & Hormigón
Representation of the client in legal proceedings initiated by the owners of the Kampala Building located in Medellín, due to the structural flaws that caused its evacuation.
COP 2.500.000.000
Sanin Abogados
Representation of the client as the plaintiff in the judicial process filed for the annulment of the minutes of the shareholders’ meeting in which the validity of the decision to assign the contractual position in an important BOOMT contract within the framework of a hydroelectric power plant project in Medellín is disputed.
COP 18.500.000.000
Consorcio Gaico – Hycsa – Gaico Ingenieros Constructores (Mexico), Calzada Construcciones (Mexico).
Legal advice during the execution of the contract for the construction of the Metroplus project and complementary works, which is part of the improvement plan of the public transportation system throughout the Aburrá Valley.
COP 29.000.000.000
Jaime Gómez; Federik George Bridge Gutiérrez; Lilian Bridge Gutiérrez; Altima, Factorizar, Paisajes, Valores Simesa, Juan Carlos Duque, Astrid Vélez. A Vélez B.
Representation of the client in the lawsuit seeking the nullity of Agreement 045 of 2013 through which powers were conferred to the municipal mayor of Rionegro to carry out the collection of valuation.
COP 616.451.037