2020

Concesión Ruta al Mar – Construcciones El Cóndor, Infrared Capital Partners (The United Kingdom)

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Preparation of a legal concept on the scope of the operation and maintenance obligations of the Concessionaire within the framework of the execution of the 4G concession for the Antioquia-Bolivar connection.

Not applicable

2020

O-tek Grupo Orbis

Sector: Infrastructure

Practice Area: Insurance Law |

Legal advice to the client in the process of claiming a compliance policy in its works stability coverage.

COP $3.000.000.000

2020

Procopal

Sector: Infrastructure

Practice Area: Public Law |

Representation of the client in legal proceedings for damages suffered by third parties during the La Niña phenomenon winter wave on the Manizales-Bogota highway and for the accident of an Expreso Bolivariano bus due to the avalanche caused by the overflowing of the Quebrada La Mula.

COP 15.588.590.304

2020

Concesión Ruta al Mar – Construcciones El Cóndor, Infrared Capital Partners (The United Kingdom)

Sector: Infrastructure

Practice Area: Public Law |

Representation of the client in the process of protection of collective rights and interests aimed at achieving a change in the route of the Lorica Bypass, in the area of the Bajo Sinú (complex swamp), in connection with the execution of the 4G road concession for the Antioquia-Bolívar connection.

Not applicable

2020

Sociedad Constructora de Obras Civiles – Sococil

Sector: Infrastructure

Practice Area: Dispute Resolution |

Representation of the client in direct arrangement with the Mota-Engil Consortium in connection with the construction of more than 30,000 classrooms under the National Development Plan for the period 2015-2018 of the Colombian Government, derived from the execution of the Work Framework Contract 1380-36-2016 for the construction of educational infrastructure in the regions of Antioquia, Eje Cafetero and Pacífico. 

COP 700.000.000

2020

Ossa – Obras Subterráneas (Spain)

Sector: Infrastructure

Practice Area: Labor Law and Social Security |

Legal advice to the client in the management of labor relations with its 100 workers, within the execution of the excavation and pre-support works of the Sinifaná Tunnel, located in Bolombolo, Antioquia, as part of the Pacifico 1 project.

Not applicable

2019

Pavimentar

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Preparation of the claim addressed to Fonvalmed, within the framework of the execution of the public work of the Loma Los Parra overpass in Medellín.

COP 650.000.000

2019

Ingevías

Sector: Infrastructure

Practice Area: Labor Law and Social Security |

Representation of the client in 6 labor lawsuits in Armenia in connection with the construction of the Road and Sidewalks Project in Section II of 50th Street from the Puente de los Naranjos to the CAI ( Police Station).

COP 311.114.175

2019

Consorcio Corredor Vial 013- ICPB- Ingeniería y Construcción Palacio Baena y Sococil- Sociedad Constructora de Obras Civiles

Sector: Infrastructure

Practice Area: Projects and Infrastructure |

Representation of the client and legal advice during the public bidding process for the contracting of the improvement, expansion, and paving of the Barbosa-La Raya road, an integral part of the road that connects the north of the Aburrá Valley and the San Nicolás Valley in the department of Antioquia.

COP 14.334.422.884

2019

Asfalto & Hormigón

Sector: Infrastructure

Practice Area: Insurance Law |

Representation of the client in an Arbitration Tribunal that represented a high legal complexity as it involved coverage discussions and layers of the PLO coverage of a civil liability policy and the coverages of an all risks construction policy. It also involved coverage of costs incurred to prevent the insured from spreading the loss and multiple technical and economic discussions on the existence, causes, and amount of the loss. The case was finally able to be settled prior to the issuance of the award.

COP 1.151.250.123