Sanin Abogados

Year: 2021

Practice Area: Dispute Resolution


Representation of the client as the plaintiff in the judicial process filed for the annulment of the minutes of the shareholders’ meeting in which the validity of the decision to assign the contractual position in an important BOOMT contract within the framework of a hydroelectric power plant project in Medellín is disputed. 

COP 18.500.000.000

Consorcio HHA- Hyundai Engineering and construction (Korea), Acciona Agua (Spain)

Year: 2021

Practice Area: Projects


Legal advice to the client in the negotiation of the settlement of the contract for the construction of the wastewater treatment plant “Aguas Claras” located in Bello in the department of Antioquia – ANEPM.

COP 349.703.774.284 , EUR 74.539.130, USD 63.457.515

Comercializadora S&E

Year: 2021

Practice Area: Dispute Resolution


Legal advice to the client regarding the direct settlement of the contract for the construction of two potable water storage tanks for the population of Loma Alta, district of Buenaventura.

COP 240.000.000.000

Unión Temporal Mejía Acevedo – Mejía Acevedo, Comercializadora S&E

Year: 2021

Practice Area: Projects


Permanent legal advice during the execution of the contract entered into with EPM for the construction, replacement, and modernization of networks, connections and pressure regulating stations, regulation zones, and complementary sewage works in Medellín.

COP 40.786.552.391

Consorcio Tadeo Caldas – Mopsa, Darca Ingenieros Asociados de Colombia

Year: 2021

Practice Area: Projects


Permanent legal advice during the execution of the contract for the construction of the south interceptor and works necessary for the collection of wastewater discharges for EPM in the department of Antioquia.

COP 18.998.355.285

Consorcio Cuenca La García 2020- Ingeniería y Contratos, Redyco

Year: 2021

Practice Area: Projects


Permanent legal advice during the execution of the contract for the construction of sewerage networks and connections and complementary works required for the La García basin for EPM, in the department of Antioquia.

COP 39.377.154.237

Unión Temporal Mejía Acevedo – Mejía Acevedo, Comercializadora S&E

Year: 2021

Practice Area: Projects


Permanent legal advice during the execution of the contract for sewerage networks and connections as well as complementary works required for the La García basin for EPM, in the department of Antioquia.

COP 37.025.556.092

Paecia

Year: 2021

Practice Area: Projects


Permanent legal advice during the execution of the contract for the construction of the San Rafael and Capiro tanks, San Rafael pumping station, adaptation of lots, and complementary works, for the Envigado – El Capiro Expansion Project belonging to EPM, in the department of Antioquia.

COP 15.642.684.884

Ingeniería y Contratos

Year: 2021

Practice Area: Projects


Permanent legal advice for the execution of the contract for the construction of the aqueduct networks and complementary works of the San Nicolás project of EPM in the department of Antioquia.

COP 19.323.399.801

Consorcio HHA- Hyundai Engineering and construction (Korea), Acciona Agua (Spain)

Year: 2021

Practice Area: Projects


Permanent legal counsel since 2012, in the contract for the construction of the wastewater treatment plant “Aguas Claras” located in Bello in the department of Antioquia – ANEPM.

COP 349.703.774.284 EUR 74.539.130 USD 63.457.515